Photo: Aft cabin refurb 1. The secondary bulkheads were made in two sections (top and base)
Photo: Aft cabin refurb 2. Getting the cut-outs in the right place took all my O Level Geometry skills! NB: RUDDER!!
Photo: Aft cabin refurb 3. The shelves were relocated from the aft bulkhead.
Photo: Kerry Piper Aft cabin refurb – heads. NB: Folding basin was originally located in the galley.