A68 Curlew restoration project £1500 offers
Hull, mostly stripped back to bare wood ready to be repainted. A couple of minor patches completed excellent condition with no rot. Sand keel recently and probably keel boxes have been replaced.Read More…
Hull, mostly stripped back to bare wood ready to be repainted. A couple of minor patches completed excellent condition with no rot. Sand keel recently and probably keel boxes have been replaced.Read More…
Bought from a pattern maker (very competent wood worker) 18 months ago as a back to bare restoration project. It has been dry stored in a barn. Has to now be soldRead More…
Curlews keels and mechanisms have been removed and restored, fortunately a straightforward job as the stirrups had already been upgraded to stainless. The keels are in good condition but have shot blastedRead More…
Engine refurbished rebuilt and repainted. Yanmar GM10 Title: IMG_2364
Old paint removal almost complete, very sound woodwork. next stage keel removal and repainting. Title: Stripping A68 HullCaption: Stripping A68 Hull Title: Stripping A68 HullCaption: Stripping A68 Hull Title: A68 Hull restorationCaption: StrippingRead More…